Library

7 Sisters Project: Environmental and Social Impact Assessment (ESIA) 2024

The National Water and Sewerage Authority has identified the Seven Sister Transmission Line
project to increase the production of raw water which will con-tribute to the programmeís
objective to improve a climate-resilient water supply system. The statement contained in this document, prepared by Kocks Consult in cooperation with Roberts Caribbean Limited, represents the final draft Environmental and Social Impact Assessment for the proposed project. The Assessment is compliant with Section 22 of the Grenada Physical Planning and Development Control Act 2016, applicable national policies and legislation, and the GCF Interim Environmental and Social Safeguards.

Document date: February 12, 2025

Document Source

National Water and Sewerage Authority (2024)